POLYCULE DATE SCHEDULING FOUND TO BE NP-HARD
https://arxiv.org/abs/2403.00465

arXiv.orgPolyamorous SchedulingFinding schedules for pairwise meetings between the members of a complex social group without creating interpersonal conflict is challenging, especially when different relationships have different needs. We formally define and study the underlying optimisation problem: Polyamorous Scheduling.
In Polyamorous Scheduling, we are given an edge-weighted graph and try to find a periodic schedule of matchings in this graph such that the maximal weighted waiting time between consecutive occurrences of the same edge is minimised. We show that the problem is NP-hard and that there is no efficient approximation algorithm with a better ratio than 4/3 unless P = NP. On the positive side, we obtain an $O(\log n)$-approximation algorithm; indeed, a $O(\log Δ)$-approximation for $Δ$ the maximum degree, i.e., the largest number of relationships of any individual. We also define a generalisation of density from the Pinwheel Scheduling Problem, "poly density", and ask whether there exists a poly-density threshold similar to the 5/6-density threshold for Pinwheel Scheduling [Kawamura, STOC 2024]. Polyamorous Scheduling is a natural generalisation of Pinwheel Scheduling with respect to its optimisation variant, Bamboo Garden Trimming.
Our work contributes the first nontrivial hardness-of-approximation reduction for any periodic scheduling problem, and opens up numerous avenues for further study of Polyamorous Scheduling.